A complete refit without loose ends
One continuous project
We take the room from protected strip-out through fitting, testing and handover.
Hidden services checked
We inspect exposed pipework and drainage before new finishes restrict access.
Practical layout advice
We balance your preferred design with pressure, drainage and usable space.
Your old bathroom removed and rebuilt
A bathroom refit involves much more than swapping one suite for another. We protect the work area, isolate the services and remove the old fixtures before checking the exposed supplies and wastes. We can then adapt the pipework, fit the new bath, shower, basin, toilet and taps, and test every connection before handover. Keeping the strip-out and installation together means fewer gaps between trades and a clearer path from a room you no longer enjoy using to one that works properly. We plan the sequence carefully because discovering a poor connection after everything has been closed in is nobody's idea of progress.


Plan the layout before fitting begins
Your layout needs to suit the room, the available pressure and the way you use the bathroom. We discuss bath or shower choices, sanitaryware positions, storage, drainage, access and ease of movement before fixing anything in place. An average bathroom has an indicative project range of £10,000 to £15,000, with full refits typically taking two to three weeks. The final figure and programme depend on the existing room, chosen fittings and changes to pipework. Our 40 years of plumbing and heating experience helps us spot practical issues while they are still easy to address.
Frequently asked questions
How long does a complete bathroom refit take?
We typically complete a full bathroom project in two to three weeks. The programme can vary with layout changes, the condition of hidden pipework, fixture choices and other work needed once the old room has been removed.
What does an average bathroom refurbishment cost?
We give an indicative range of £10,000 to £15,000 for an average bathroom. We need to assess the room, intended layout, fittings and pipework changes before discussing a project-specific price.
Can you remove the whole bathroom before refitting it?
Yes. We can isolate the services, remove the old suite, expose and adapt the relevant pipework, then fit and test the new fixtures. This gives us access to problems that would otherwise remain hidden.
