Use the open room to fix hidden issues
Services safely isolated
We disconnect water and fixtures before controlled removal begins.
Hidden pipework reviewed
We assess accessible supplies and wastes while nothing blocks the view.
New fixtures connected
We prepare, fit and test replacement sanitaryware as one planned job.
Clear the room and expose what matters
Removing an old bathroom creates the best opportunity to see the pipework and drainage hidden behind fixtures and finishes. We protect the route and work area, isolate the services and disconnect the existing suite before removing the toilet, basin, bath, shower or taps included in the project. With the room cleared, we can assess accessible supplies, waste, and connections before they disappear behind new fittings. This stage is important when an old layout has been altered several times or shows signs of leakage. Finding a poor joint now is far better than meeting it later through a newly finished wall or floor.


Prepare every service for the new fixtures
The replacement layout must suit the available room, water supplies and drainage. We check fixture dimensions and connection positions before adapting pipes and wastes for the new toilet, basin, bath or shower. Once the services are ready, we fit the agreed items and test operation, flow and drainage. We can handle the complete change from old room to new fixtures rather than stopping after demolition or replacing one item in isolation. This continuity keeps the exposed services, new fittings and final testing part of the same plan, with fewer assumptions passed from one stage to the next.
Frequently asked questions
What happens during a bathroom strip-out?
We protect the working area, isolate services, disconnect fixtures and remove the agreed suite. We then inspect accessible supplies and wastes before preparing them for replacement fittings.
Can you replace every fixture in the bathroom?
Yes. We can replace toilets, basins, baths, showers and taps as part of a complete refit. Fixture choice must suit the room, available services and intended layout.
Why inspect pipework while the bathroom is empty?
A cleared room gives better access to connections that new fixtures and finishes will hide. We can spot visible wear, poor routes or leaks before access becomes difficult again.
